When the previously installed system on this Grade-A, cutting-edge retail
and office development was deemed unsuitable, our client appointed APS
as their height-risk management partner, due to our reputation as well
as our quality & safety performance on previous joint-projects.
Office Development, Semple Street, Edinburgh

APS Solution
Elements of the existing systems did not comply with current standards, so APS provided a full-service solution from consultation & design, through to installation, PPE, training and on-going maintenance.
The complete fall protection scheme included the installation of 3M’s Cabloc Pro vertical fall arrest system to the existing fixed access ladders and a freestanding guardrail system to the perimeter of each roof area.